Project Name: DSTA Land Preparation, Airfield And Ancillary Works At Changi East

Scope of Work: RC Piles

Contract: -
Clients: KTC Civil Engineering & Construction Pte Ltd
Consultant: -

Project Name: Capri Hotel @ China Square – Proposed Addition of 16-Storey Capri Hotel and Additions & Alterations to Existing Commercial Development Lot 00617A TS04 at 181 South Bridge Road / 18, 20, 22 Cross Street (Outram Planning Area)

Scope of Work: Bored Pile

Contract: -
Clients: Nakano Singapore Pte Ltd
Consultant: -

Project Name: Propsed Mixed – User Commercial Development Comprising Shopping / Office / Residential and Carparks with Airspace / Subterranean Conenctions Along Sims Avenue on Lots 6991M & 7373T MK23 Paya Lebar Road / Sims Avenue

Scope of Work: Bore Piles

Contract: -
Clients: Lend Lease Singapore Pte Ltd
Consultant: -

Project Name: S80641 3M Tuas 2 – C02A & C02B – Ultimate Load Test / Piling

Scope of Work: RC Piles

Contract: -
Clients: M+W Singapore Pte Ltd
Consultant: -

Project Name: Proposed Development of A 7-Storey Pioneer Polyclinic With 1 Basement At Jurong West Street 61

Scope of Work: Soldier Pile, Steel Plate, King Post, Deck Post Works

Contract: -
Clients: Chang Ding Engineering Pte Ltd
Consultant: -

Project Name: Project Lion – Phase 2

Scope of Work: RC Piles

Contract: -
Clients: Afton Chemicals Asia Pte Ltd
Consultant: -

Project Name: Proposed 4-Storey Commercial Development With 2 Basement Carpark On Lot 01048A TS17 At 11 Sam Leong Road (Kallang Planning Area)

Scope of Work: Bored Pile / Secant Bored Pile / King Post Works

Contract: :-
Clients: W'ray Construction Pte Ltd
Consultant: :-

Project Name: Bored Piling Works To Proposed A&A Works To West Spring Primary School At Bukit Panjang Ring Road And West Wood Primary School (Jurong West Street 61)

Scope of Work: Bored Piles

Contract: :-
Clients: Woodwater Integrated Pte Ltd
Consultant: :-

Tan Tock Seng (Project Photos)

Project Name: Proposed Erection of National Centre for Infectious Diseases, Centre for Healthcare Innovation with Basement and Ancillaryworks at Jalan Tan Tock Seng

Scope of Work: Bored Pile Works

Contract: :
Clients: Kajima Overseas Asia Pte Ltd
Consultant: :

Seletar Camp

Project Name: Project A0849-00041_2015 Development of Facilities and Infrastructures at Seletar

Scope of Work: RC Piles

Contract: :-
Clients: Ken-Pal Pte Ltd
Consultant: :-

T215 - for company website

Project Name: Contract T215 Construction of Mt Pleasant Station and Tunnels For Thomson Line

Scope of Work: Bored Pile Works

Contract: :
Clients: Wai Fong Construction Pte Ltd
Consultant: :

Project Name: Contract T212 Construction Of Upper Thomson Station And Tunnels For Thomson Line

Scope of Work: Bored Pile Works

Contract: :
Clients: Sato Kogyo (S) Pte Ltd
Consultant: :

T225

Project Name: Contract T225 Construction Of Shenton Way Station And Tunnels For Thomson Line

Scope of Work: Bored Pile Works

Contract: :
Clients: Shanghai Tunnel Engineering Co. Ltd
Consultant: :

Project Name: Proposed Piling Work for Aurora-Eos Project at EXXONMOBIL, Jurong Island

Scope of Work: Bored Pile Works

Contract: :
Clients: Shimizu Corporation
Consultant: :

c936

Project Name: C936 Construction and completion of Bencoolen Station for Downtown Line Stage 3

Scope of Work: Bored Pile works

Contract: --
Clients: Sato Kogyo (S) Pte Ltd
Consultant: Arup Singapore Pte Ltd